Home / Capability
What we control
The checks and paperwork that decide whether a replacement part gets approved on site.
Dimensional and material specifications matched to original equipment tolerances.
Machined on calibrated equipment with in-process gauging at every critical stage.
Every part is checked before packing — we do not batch-sample.
Pumps and housings are pressure-tested and certified leak-free before dispatch.
MTCs issued with the shipment so your inspection team can verify on arrival.
Full production part approval documentation for OEM and tier-one programmes.
Export documentation, packing and dispatch managed in-house from Pune.
Part identification and cross-referencing from our engineering desk in Pune.
Next step
Need the paperwork with your order?
Material test certificates and PPAP submissions are issued on request — tell us what your inspection team needs.